Executive Summary — The British Democratic Alliance 25-Year Electrification Strategy
The United Kingdom stands at a historic crossroads. For decades, the nation has drifted through an incoherent energy strategy shaped by short-term political priorities, institutional fragmentation, chronic underinvestment, and misplaced faith that markets alone could deliver national security. The result is a fragile energy system that relies heavily on imported fuels, intermittent generation, unreliable infrastructure, and outdated governance.
This white paper presents the British Democratic Alliance’s comprehensive, engineering-led plan to rebuild the United Kingdom’s energy system and restore national stability, prosperity, and sovereignty.
Based on corrected, reality-tested modelling, it demonstrates that full electrification of heat, transport, industry, and digital infrastructure will require:
- Annual electricity generation of 620–750 TWh
- Winter peak capacity of 100–120 GW
- Total national nameplate capacity of 200–250 GW
This represents a doubling of annual electricity supply and more than a doubling of dependable winter capacity. Current UK infrastructure cannot support even a fraction of this requirement. Without wholesale reform, Britain faces long-term insecurity, rising costs, and energy instability.
To achieve electrification and secure the nation’s future, the BDA proposes a complete restructuring of national energy planning, investment, and governance.
- Key Findings
1.1 The UK’s current energy system is structurally incapable of supporting electrification
- National Grid’s dependable capacity is ~36 GW against winter peaks of 45–48 GW.
- Transmission bottlenecks waste Scottish renewable generation and force English gas burn.
- Distribution networks cannot support mass heat pump or EV adoption.
- Nuclear capacity is collapsing faster than replacements are built.
- Britain has almost no long-duration storage.
- Intermittent renewables cannot stabilise the system during winter stills.
This is not a future crisis — it is happening now.
1.2 Full electrification doubles national energy demand
Corrected modelling shows:
- Domestic heating → ~100 TWh annually, +33 GW peak
- BEVs → ~45 TWh annually, +17.5 GW peak
- Data centres → 15–20 TWh
- Industrial electrification → 120–150 TWh
- Hydrogen for industry → 80–120 TWh
- Services and public sector → 100–120 TWh
The UK’s total annual demand will reach 620–750 TWh, spread across a winter peak of 100–120 GW.
1.3 The current “net zero” plan is physically unachievable
- Intermittent renewables cannot meet peak demand.
- Batteries cannot bridge multi-day winter wind droughts.
- Heat pumps and EVs overwhelm distribution networks.
- Nuclear decline undermines grid stability.
- Planning law prevents infrastructure construction at necessary scale.
- Hydrogen strategies ignore industrial realities.
The slogan survives only because the mathematics has been ignored.
- Core Pillars of the BDA 25-Year Electrification Strategy
2.1 Build the firm power backbone
Britain requires 60–80 GW of new firm generation, achieved through:
- 30–40 GW deep geothermal
- 20–30 GW new nuclear (large reactors + SMRs)
- 2–4 GW tidal range
- Reservoir and pumped-storage reinforcement
This replaces gas-fired stability with domestic, zero-carbon baseload.
2.2 Deploy renewables at scale — in a realistic system
- 80–100 GW offshore wind
- 40–60 GW solar (with mandatory rooftop PV on new homes)
- Onshore wind reclassified as national infrastructure
- Integrated meshed offshore HVDC grid
Renewables supplement, but do not replace, firm power.
2.3 Rebuild the national grid
- Two north–south 6–8 GW HVDC spines
- East–west HVDC corridor
- Meshed offshore transmission
- New inland 400 kV routes
- National rollout of grid-forming inverters
- Distribution reinforcement across all urban and suburban regions
The grid becomes the backbone of national electrification.
2.4 Transform heating
- Mandatory heat pumps in all new homes from 2026
- Full phase-out of gas boilers by 2040
- EPC B standard for all new housing
- Retrofitting programme for EPC D and below
- Ground-source heat zoning
- District heating where appropriate
Heating reform is the centrepiece of system stability.
2.5 Electrify transport and rail
- EV charging rollout aligned with grid reinforcement
- V2G ready EV standards
- National rapid-charger corridors
- Full rail electrification by 2040
- Electric freight hubs at ports and logistics centres
Transport electrification becomes structured, not chaotic.
2.6 Re-industrialise Britain
- Industrial energy zones anchored by SMRs and geothermal
- Domestic manufacturing of turbines, transformers, HVDC cables
- UK hydrogen hubs producing industrial feedstock
- Rebuild steel, chemicals, hydrogen, advanced materials
Energy becomes an engine of economic renewal.
2.7 National Energy and Infrastructure Authority (NEIA)
A new statutory body with powers to:
- override local planning
- sequence and deliver national infrastructure
- control grid investment timelines
- manage nuclear, geothermal, tidal, and storage projects
- guarantee long-term strategic continuity
This ends 30 years of institutional fragmentation.
2.8 Finance through discipline, not austerity
Total cost: £520–850 billion over 25 years
Annual cost: £21–34 billion
Funded through:
- sovereign infrastructure bonds
- UKIB expansion
- energy-security budget
- industrial co-investment
- predictable long-term contracts
Cheaper than energy imports, cheaper than decline, and far cheaper than inaction.
2.9 Build the workforce
Creation of the UK Energy Corps (UKEC) to train tens of thousands of:
- drilling technicians
- grid engineers
- nuclear specialists
- turbine techs
- HV engineers
- heat pump installers
- hydrogen operators
A national workforce for a national rebuild.
- National Benefits
3.1 Energy sovereignty
Britain ends dependence on imported gas, foreign turbines, and unstable global markets.
3.2 Economic resilience
Stable, low-cost power rebuilds manufacturing, reduces inflation, and boosts productivity.
3.3 Social stability
Reliable energy lowers bills, supports families, and reduces economic stress.
3.4 Environmental integrity
A realistic, engineering-led clean system replaces ideological fantasy.
3.5 Digital and geopolitical security
Firm baseload protects data centres, AI infrastructure, and military resilience.
3.6 National renewal
Competent infrastructure builds public trust, national confidence, and civic pride.
- Conclusion: A Nation Rebuilt Through Competence
The BDA’s electrification plan is more than an energy strategy — it is the blueprint for Britain’s renewal. It confronts physical reality, rejects political fantasy, restores national confidence, and rebuilds the state around competence, sovereignty, and long-term thinking.
A nation that controls its energy controls its future.
This white paper is the plan for Britain to do exactly that.
PART I — The Current State of Energy in the United Kingdom (Rewritten & Corrected)
- Introduction: A System Built for Yesterday, Straining Under Tomorrow
The United Kingdom operates an energy system that no longer matches the needs of a modern industrial nation. For more than three decades successive governments have pursued an approach to energy policy rooted in short-term cost-cutting, privatisation dogma, and a persistent belief that market forces could deliver long-term security without strategic planning. This has produced an energy landscape where infrastructure is old, generation is unbalanced, storage is almost non-existent, and regulatory oversight is fragmented and weak.
The result is a system that works only under normal conditions — and fails under stress. Britain experiences periods of high wind generation and low demand and congratulates itself on progress. But when winter high-pressure systems settle over the UK, wind drops to single digits, solar collapses, heating demand surges, and the fragile balancing act behind the scenes becomes exposed. The nation then falls back on a single crutch: natural gas.
Understanding the current system requires discarding political spin and examining the physical reality. Once corrected national demand projections are applied, it becomes clear that the existing energy system is not merely insufficient for future electrification — it is inadequate for today’s needs.
- The UK’s Present Electricity Mix: Dependence Hidden Behind Intermittency
Despite decades of rhetoric about energy transition, natural gas still dominates UK energy supply. Around 35–40% of electricity generation in a typical year comes from gas-fired power stations, and during low-wind winter weeks that figure can exceed 55–60%. Gas remains the balancing fuel, the baseload fallback, and the contingency plan.
Wind and solar collectively provide roughly 25–30% of annual electricity, but their contribution is highly variable and heavily dependent on weather patterns. Solar output is negligible in winter — precisely when demand is highest — and wind output can fall from 14–18 GW to less than 2 GW for days at a time during cold stills.
Nuclear currently provides 15% of supply, but the UK’s aging fleet is being decommissioned faster than replacement reactors are being built. Without immediate intervention, Britain will lose more nuclear capacity in the next decade than it is scheduled to gain.
Interconnectors supply another 8–10%, yet they provide no security guarantee. During European shortages, these lines reverse or constrain exports to Britain. Interconnectors can support a secure system, but they cannot underpin one.
The corrected national modelling makes clear that the UK will require 620–750 TWh of electricity annually by 2050 — double today’s system. With firm capacity declining and intermittent renewables unable to provide winter stability, the present generation mix is structurally incapable of supporting the transition now demanded of it.
- Gas Dependency: Britain’s Fragile Backbone
The UK’s reliance on gas is not simply a matter of electricity. Around 85% of UK homes use gas for heating, and heating represents the single largest source of seasonal energy demand. When winter temperatures fall, gas consumption rises sharply. Electrifying this sector is essential, but the corrected demand calculations show what this means: even after applying COP and diversity factors, a fully electrified domestic heating system adds ~100 TWh per year to national electricity demand and 33 GW to winter peak.
Gas is also deeply embedded in British industry. High-temperature industrial processes, chemical manufacturing, ceramics, steel, cement and pharmaceuticals rely on fossil fuels for heat. Without electrification of these processes — or hydrogen feedstock where electrification is impossible — industry remains dependent on imported natural gas.
The UK now imports more than 50% of its gas supply, and in 2022 energy imports cost the nation £117 billion — an economic haemorrhage comparable to the budgets of several government departments combined. LNG imports expose the UK to volatile global markets, shipping constraints, rising geopolitical tensions and competition from Asia. Gas dependency is a systemic risk, not a strategic asset.
- Generation Capacity: The Illusion of Abundance
Britain’s “installed capacity” is often reported at ~80 GW, but this number collapses when capacity factors are applied. Your earlier rough calculations correctly identified this problem; here it is expressed precisely:
- Real nuclear availability: ~5–6 GW (falling)
- Real wind availability: 20–30% of nameplate
- Real solar availability: 10–12% of nameplate
- Gas availability: high, but dependent on imports
- Hydro: negligible at national scale
When real capacity is calculated, Britain operates with ~36 GW of dependable power, against today’s winter peak of 45–48 GW. This gap is already bridged by gas and imports; both are increasingly fragile.
Corrected projections show UK winter peak demand rising to 100–120 GW under full electrification. This is more than twice today’s dependable capacity. Unless the UK adds 120–160 GW of additional nameplate generation, with at least 60–80 GW of firm power, the transition collapses.
- Transmission: The North–South Disconnect That Wastes Energy Daily
Britain suffers from a structural mismatch: much of its wind generation is in Scotland, but most of its winter demand is in England. Transmission infrastructure linking north and south is outdated, narrow, and inadequate.
During high wind periods Scotland produces far more electricity than it can consume or export; transmission constraints force wind farms to shut down, compensated by public funds. Meanwhile, fossil-fuelled plants in England ramp up to meet demand that Scottish wind could have met if the transmission corridors existed.
The corrected demand model shows this gap widening. Winter electrification loads will rise significantly in England, while future offshore wind developments will remain heavily concentrated in Scotland and the North Sea. Unless the UK constructs new HVDC spines, inland corridors and offshore meshed networks, billions in renewable investment will be wasted through curtailment.
Transmission weaknesses are not an inconvenience — they are a structural ceiling on national capacity.
- Distribution Networks: The “Final Mile” That Will Determine Success or Failure
The greatest overlooked constraint in UK electrification is the distribution network: the substations, transformers and low-voltage feeders serving neighbourhoods and industrial estates.
Electrification of heating and transport places enormous stress on these assets. Corrected modelling shows:
- 33 GW of winter heat pump peak
- 17.5 GW of peak EV demand
- concentrated regional loads.
- urban substations operating close to thermal limits
- voltage drop risks in older neighbourhoods.
- insufficient balancing and phase adjustment.
These loads strike distribution networks first. Before the transmission grid collapses, local networks will fail — overloaded substations, blown fuses, brownouts and widespread voltage instability.
DNOs (Distribution Network Operators) operate under regulatory regimes that reward minimal spending, not anticipatory reinforcement. The UK has, therefore, structurally underinvested in the very layer of the grid required for electrification.
Transmission matters.
Generation matters.
But distribution is the critical path — and today it is the weakest part of the system.
- Storage: The Non-existent Insurance Policy
Britain has almost no medium- or long-duration storage. Lithium-ion batteries provide seconds-to-hours of support; pumped hydro provides hours-to-days. Seasonal storage — essential for a renewables-heavy fully electrified system — does not exist at scale.
Corrected modelling confirms the severity of this gap. Winter heating and transport loads occur precisely when wind can be at its lowest. A wind drought of five days would require tens of gigawatt-hours of firm backup — orders of magnitude beyond any current UK storage facility.
Politicians speak of batteries as if they can substitute for gas-fired backup. They cannot. No realistic deployment of lithium storage can power Britain through a multi-day still winter event. Seasonal imbalance is a physical problem requiring firm baseload, pumped hydro, hydrogen storage for industry, and geothermal or nuclear stability.
The UK has ignored storage for 25 years. It cannot do so for another 25.
- Nuclear Decline: A Failure Three Decades in the Making
The UK once had a world-leading nuclear fleet. Today, most reactors are scheduled to close by 2030, with no equivalent replacement in sight. Hinkley Point C is delayed, Sizewell C is underfunded, and SMR deployment has been continually postponed.
Without nuclear stabilising the grid, the system becomes dramatically more reliant on gas during winter peaks — exactly when gas imports are most vulnerable and most expensive.
The corrected 2050 demand projection requires 20–30 GW of nuclear capability. Britain currently has less than 6 GW operational.
This shortfall is not merely an oversight — it is a strategic failure.
- Digital Infrastructure: The Quiet Burden No One Planned For
Data centres, AI clusters and digital infrastructure now represent one of the fastest-growing electricity loads. Your draft correctly identified the error in treating this sector as a rounding error. With more than 513 data centres operating in the UK, and with PUE ratios averaging around 1.6, the digital sector will consume:
- 10–15 TWh/year by 2035.
- 15–20 TWh/year by 2050.
Unlike heating or EVs, this demand is continuous. Data centres require stable baseload and cannot rely on intermittent renewables for primary supply. Any attempt to electrify the nation without accounting for digital load is fundamentally flawed.
- Conclusion: A System Strained to Breaking Before the Transition Even Begins
The corrected electrification model makes the state of the UK energy system starkly clear. Britain is attempting a 21st-century electrification programme using infrastructure built for a 20th-century fossil system.
Key realities:
- The UK must produce double today’s electricity by 2050.
- Peak demand will exceed 100–120 GW under electrification.
- Firm capacity is collapsing while intermittent capacity grows.
- Transmission cannot move power from where it is generated to where it is needed.
- Distribution networks cannot support neighbourhood-level electrification.
- Storage is insufficient by multiple orders of magnitude.
- Nuclear decline has removed the only stable winter backbone.
- Gas dependency is a strategic vulnerability, not an asset.
- Digital infrastructure is rising faster than grid reinforcement.
This is not a system that needs minor reform.
It is a system that requires rebuilding.
PART II — Infrastructure Limitations and Systemic Failures (Rewritten & Corrected)
- Introduction: An Energy System Built on Outdated Assumptions
The United Kingdom’s electricity system remains fundamentally constrained by infrastructure designed for the late 20th century. It was built for a world in which most heating was gas-fired, most transport was petroleum-powered, industry relied on fossil fuels for heat, and electricity demand grew slowly and predictably. That world has vanished, yet the infrastructure underpinning daily life has not changed with it.
The modern UK electricity system is expected to absorb the electrification of transport, heating, industry, rail, digital infrastructure, and hydrogen production — all while replacing fossil-fuelled generation with low-carbon alternatives. This is a transformation of historic magnitude, but the grid has not been upgraded to support it. Regulatory structures were never designed for this level of change, and the system’s physical constraints now threaten the stability, reliability, and affordability of national energy supply.
The extent of the challenge becomes even clearer when the corrected electrification demand model is applied. Once heat pumps, electric vehicles, re-industrialisation, rail electrification, digital infrastructure and hydrogen are properly accounted for using realistic diversity factors, seasonal load profiles and COP behaviour, the UK’s future electricity needs are not speculative: they exceed 600 terawatt-hours per year, with winter peak demand rising to between 100 and 120 gigawatts — more than double today’s system.
This is the context in which the UK must understand its infrastructure limitations: not theoretical, not ideological, but physical and binding.
- Transmission: The Restriction That Defines the System
Transmission capacity is not merely a bottleneck; it is the defining limit of what the UK can realistically achieve. Without sufficient north–south, coast–inland and inter-regional movement of power, the nation is locked into permanent underperformance regardless of how many gigawatts of renewable generation developers attempt to build.
2.1 Scotland: A Generation Giant with Nowhere to Send Its Power
Scotland regularly produces more electricity from renewables than it can store or export. Wind generation frequently exceeds local demand by large margins, yet transmission constraints force curtailment, leading to wind farms being paid to shut down while gas turbines in England burn fossil fuel to manage local demand. This is not an indictment of renewables; it is an indictment of infrastructure.
Corrected demand modelling confirms that UK future peak winter demand will exceed 100 GW, yet Scotland’s excess wind cannot reach the areas of highest winter load because the transmission backbone is outdated, narrow, and chronically underbuilt. No modern nation can run a stable system when its cheapest and cleanest power is systematically wasted.
2.2 Offshore Wind Integration Without Transmission Reform Is Self-Defeating
The expansion of offshore wind around the UK coastline requires a coordinated, meshed offshore grid — a network of HVDC links capable of delivering power from multiple landing points to demand centres. At present, there is no such network. Instead, each offshore wind farm seeks connection at individual substations already strained beyond design capacity.
Even with corrected national demand projections showing a requirement for 600–750 TWh per year, offshore wind cannot contribute meaningfully if transmission remains the limiting factor. New offshore corridors, onshore HVDC spines, inland reinforcements and coastal mega substations are all essential prerequisites to unlock generation already being built.
2.3 HVDC Expansion: Necessary, Slow and Behind the Curve
Planned HVDC projects such as Eastern Green Link, Western HVDC link upgrades, and other multi-gigawatt reinforcements are steps in the right direction but arrive a decade too late. Many will not enter service until the mid-2030s. Electrification does not wait for political timetables; electricity demand will surge long before the required backbone exists.
The UK’s transmission constraint is therefore not a future threat — it is a present and ongoing systemic failure that restricts every element of the transition.
- Distribution Networks: The Hidden Crisis Beneath Every Street
While transmission failures dominate headlines, the distribution network — the local cables, transformers and substations that deliver electricity to homes and businesses — is where electrification will hit hardest.
Corrected modelling shows that by 2050 winter heating alone will contribute ~33 gigawatts of additional peak electricity demand across the country, even after diversity factors and COP behaviour are applied. Electric vehicles add roughly another 17 gigawatts, small commercial heat pumps add several more, and neither rail nor digital infrastructure is negligible.
These loads do not stress the national grid first — they break the neighbourhood network.
3.1 Heat Pumps: A Localised Peak Load Shock
The vast majority of homes will not draw 7–10 kW constantly; however, during a winter cold snap, millions will draw several kilowatts simultaneously. This clustering effect will overwhelm thousands of local substations and require extensive reinforcement of feeders and transformers.
Even after realistic corrections, fully electrified domestic heating adds ~100 TWh per year and up to 33 GW at peak. The current distribution network cannot support this without major upgrades across virtually every region of the UK.
3.2 Electric Vehicles: The Evening Peak Multiplier
EV charging does not significantly impact national annual demand — around 40–50 TWh under full adoption — but it devastates local networks when clusters emerge on the same street. The corrected peak demand model shows EVs adding ~17.5 GW to national peak, but this disguises their true effect: they disproportionately stress suburban feeders, not the transmission backbone.
Unless distribution networks are strengthened, EV adoption will stall due to grid constraints long before the generation system becomes a limiting factor.
3.3 The Structural Problem: Distribution Network Operators Are Not Incentivised for Reform
The UK’s privatised DNOs operate under regulatory frameworks that reward cost minimisation, not capacity expansion. Their allowed returns do not reflect the scale of the transition, and Ofgem’s price-control model actively discourages risk-taking or upfront investment.
The consequence is systemically delayed reinforcement, exactly when electrification requires the opposite. No distribution company has an incentive to overbuild capacity, but electrification demands it.
- Storage and Stability: The Missing Middle Layer of the System
A large, renewables-rich electricity system requires short-, medium- and long-duration storage. The UK currently has almost none of the medium or long-duration categories.
Corrected electrification modelling shows winter heating loads coinciding with periods of low wind and minimal solar contribution. These “cold stills” require multi-day resilience, not lithium-ion batteries designed for minutes and hours.
Britain’s storage deficit is therefore not a future consideration — it is a present structural risk.
4.1 Lithium Batteries Are Not Seasonal Storage
Lithium is superb for grid balancing and fast-response stabilisation, but even multi-gigawatt deployments cannot cover multi-day or seasonal energy deficits. Delivering even one day of winter heating using lithium storage would require astronomically large installations.
4.2 Pumped Hydro: The Untapped Giant
The UK has extraordinary potential for pumped hydro in Scotland and Wales. Yet since the 1980s, almost no new pumped-storage capacity has been commissioned. With corrected national peak demand exceeding 100 GW, long-duration hydro storage of at least 20–30 GWh per site becomes essential.
The Coire Glas project demonstrates what is possible, but without multiple such facilities the nation has no buffer against prolonged renewable droughts.
4.3 Hydrogen as Industrial Storage — Not Domestic Fantasy
Corrected figures show hydrogen production could require 80–120 TWh/year of electricity by 2050, largely for industrial heat and chemical feedstocks. Using hydrogen for domestic heating is both inefficient and unnecessary. Yet hydrogen provides value as a long-duration industrial backup for sectors that cannot fully electrify.
Current UK hydrogen policy confuses these roles and undermines both.
- Stability and Inertia: The Unspoken Engineering Crisis
Wind and solar do not provide rotational inertia. As coal and older nuclear power stations retire, frequency stability becomes more fragile. This is often ignored in political discussion but represents one of the most serious engineering risks of the transition.
Corrected peak-demand modelling makes clear that a system dominated by intermittent power would be unable to stabilise itself during winter peaks without:
- synchronous condensers,
- nuclear inertia,
- geothermal inertia,
- pumped hydro,
- or large-scale grid-forming inverters.
These technologies have not been deployed at the required scale. The ESO has repeatedly warned that without new sources of inertia, fault-level support and voltage stability, the UK grid could become unmanageable under high renewable penetration.
This is not a theoretical risk — it is already visible today on the tightest winter days.
- Regulatory Fragmentation: A System Designed to Fail Electrification
The UK’s energy transformation is governed by a maze of institutions: DESNZ, Ofgem, National Grid ESO, National Grid Transmission, six regional DNOs, hundreds of local planning authorities, the Environment Agency, Natural England, and several devolved bodies. None possess the statutory authority to mandate and sequence the infrastructure build at the speed electrification demands.
Corrected national demand projections show Britain must double annual electricity generation and more than double its peak winter capacity. No existing institution has the remit, authority, or strategic cohesion to deliver this within 25 years.
Fragmentation delays projects for years, increases cost, and undermines public confidence.
Electrification requires a single national infrastructure authority with statutory override powers — without it, the system cannot be built in time.
- Conclusion: Infrastructure Failure Makes “Net Zero” Unachievable Under Current Policy
Once corrected demand modelling is applied, the conclusion is unavoidable: the UK’s present infrastructure cannot support full electrification, and existing policy tools cannot deliver the transition at required speed or scale.
The UK faces:
- a transmission backbone years behind demand growth,
- a distribution system incapable of handling heat pumps and EVs at density,
- no medium- or long-duration storage,
- declining inertia,
- regulatory fragmentation,
- decommissioning of firm generation without replacement,
- and planning law that actively blocks infrastructure.
Under these constraints, the current interpretation of “net zero” — one based on intermittent renewables alone, underbuilt grids, inadequate storage, and unfunded electrification demands — is not simply optimistic; it is mathematically impossible.
The corrected numbers do not undermine climate goals.
They destroy only the political fantasy.
To achieve electrification and energy security, the UK must rebuild its infrastructure, revise its strategy, and adopt a baseload-led model grounded in engineering reality.
This sets the stage for Part III: the true demands of national electrification — now fully corrected and ready for integration.
PART III — The Physical and Economic Demands of Electrifying a Nation (Rewritten & Corrected)
- Introduction: Electrification as a National Engineering Obligation
Electrifying the United Kingdom is not a political aspiration — it is a structural necessity. As fossil fuels decline in availability, rise in volatility, and become strategically risky, the nation must shift heat, transport, industry, and digital infrastructure onto a stable, sovereign electricity system. The challenge is enormous, but the consequences of failing to meet it are greater: permanent import dependency, chronic inflation, industrial decline, and long-term national insecurity.
For twenty years, UK governments have framed “net zero” largely as an environmental project. In reality, electrification is an energy-security project, a national-infrastructure project, and an economic-stability project. It cannot be delivered through press releases, wishful thinking, or unfunded targets. It must be designed through mathematics, physics, engineering, and industrial capability.
This chapter provides the corrected, empirically defensible energy-demand model that reveals the scale of the transition. The numbers are not political — they are binding physical constraints. The UK must plan against them, or the system will fail.
- Annual Electricity Demand: The Corrected National Model
Today, the UK consumes approximately 300–330 TWh/year of electricity. This figure appears manageable only because most heating, transport, and industrial processes still rely on fossil fuels. Once these sectors electrify, annual electricity consumption increases dramatically.
Correct modelling — accounting for diversity factors, COP performance, seasonal demand, EV usage patterns, industrial heat requirements, rail electrification, data-centre growth, and hydrogen feedstock — produces a credible national demand range of:
620–750 TWh per year by 2050.
This is double the present system.
This section breaks down the corrected demand values sector by sector.
- Domestic Heating: The Largest Structural Shift
Decarbonisation requires electrifying domestic heating — the single largest seasonal energy load in the UK. Gas boilers hide this demand from the electricity system. Heat pumps reveal it.
3.1 Annual Demand
Using realistic assumptions:
- 23.6 million heat-pump-suitable homes
- ~4,000 kWh per home per year
- COP ≈ 2.5–3
- Heating-season operation only
- Diversity applied
→ ~94–110 TWh/year of electricity demand for domestic heating.
3.2 Corrected Peak Demand
Even after diversity and COP:
→ ~33 GW added to the winter electricity peak.
This is the largest single increase in peak load anywhere in the energy system.
Heat pumps do not “collapse the grid” — but they do redefine it. Any policy ignoring this fact is detached from engineering reality.
- Domestic Non-Heating Electricity Demand
Domestic non-heating consumption remains relatively stable:
- ~100–120 TWh/year by 2050
Despite improved efficiency, increased digitalisation and cooling demand keep overall consumption at the upper end of this band.
- Transport Electrification: The Peak-Load Multiplier
Transport electrification is essential for national autonomy, but it imposes new loads that must be understood correctly.
5.1 Annual BEV Electricity Demand
Using corrected figures:
- Average mileage ≈ 6,800 miles/year
- BEV efficiency ≈ 3.5–4.0 miles/kWh
- Consumption ≈ 1,700–2,000 kWh per vehicle per year
With full adoption:
→ 40–50 TWh/year from BEVs alone.
5.2 Peak Demand Impact
EVs are not a major annual burden — but they are a significant peak burden:
→ ~17.5 GW added to the evening winter peak if 10% of vehicles charge simultaneously at home at 7 kW.
This clustering effect drives local grid failures long before national ones.
- Small Commercial & Retail Heating
Small commercial premises (shops, workshops, offices) rely heavily on gas. Corrected modelling shows:
- ~350,000 buildings suitable for ASHP conversion
- Average annual demand ≈ 10,000 kWh per building
→ ~3–5 TWh/year additional electricity by 2050.
Not a large national burden — but a significant local burden on distribution networks.
- Rail Electrification and Public Transport
Electrifying the entire rail network — passenger and freight — and increasing service frequencies to modern standards produces:
→ ~25–35 TWh/year by 2050.
This is a moderate share of annual demand but introduces distinct peak-time draw that the grid must be designed to accommodate.
- Digital Infrastructure: The Fastest-Growing Continuous Load
With over 513 data centres already operating in the UK — and AI workloads increasing exponentially — digital electricity demand becomes a firm baseload requirement.
Corrected estimates:
→ 10–15 TWh/year by 2035
→ 15–20 TWh/year by 2050
This load is continuous. It cannot be shifted or arbitraged. It requires stable, firm generation — geothermal, nuclear, or both.
- Industrial Electrification
Industrial electricity demand is currently:
→ 81.7 TWh/year (your draft correctly identified this).
Fully electrifying industrial heat, machinery, process energy and materials production requires:
→ 120–150 TWh/year (direct electricity use)
But electrification alone cannot serve all industrial heat. Hydrogen becomes essential.
9.1 Hydrogen for Industrial Feedstock
Hydrogen is essential for:
- steelmaking
- chemicals
- fertilisers
- high-temperature processes
- heavy transport
- ammonia production
Corrected modelling gives:
→ 80–120 TWh/year for hydrogen production by 2050.
This is one of the most consistently underestimated loads in UK policy modelling.
- Services, Public Sector and “Other”
Schools, hospitals, retail, supermarkets, logistics hubs, data facilities, public buildings, refrigeration, and telecoms contribute:
→ 100–120 TWh/year by 2050.
This figure grows as gas heating is phased out and digital infrastructure expands.
- Total Corrected Annual Demand
Summing the corrected values:
| Sector | TWh/year (2050) |
| Domestic non-heating | 115 |
| Domestic heating (HP) | 100 |
| BEVs | 45 |
| Small commercial | 5 |
| Rail | 30 |
| Data centres | 20 |
| Industry (direct electricity) | 140 |
| Hydrogen (industrial) | 100 |
| Services/Other | 115 |
| Total | 670–750 |
Final corrected range:
→ 620–750 TWh per year by 2050.
The UK must build an electricity system roughly double the size of today’s — and stable enough to meet peak demands exceeding 100 GW.
- Peak Demand: The Defining Constraint
Annual electricity is important, but peak demand is what breaks systems.
Corrected peak models produce:
- Baseline (today): 45–48 GW
- Heat pumps: +33 GW
- EV charging: +17.5 GW
- Rail: +5 GW
- Industry: +10 GW
- Data centres: +3 GW
→ Total corrected 2050 peak: 100–120 GW.
This is the figure policymakers have refused to confront.
No amount of intermittent renewable generation can protect the grid from collapse during a 120 GW winter peak unless Britain invests heavily in firm generation, deep storage, and grid reinforcement.
- Firm Generation Requirements
Using actual capacity factors:
- Nuclear CF ≈ 80–90%
- Geothermal CF ≈ 90–97%
- Offshore wind CF ≈ 35–45%
- Onshore wind CF ≈ 25–33%
- Solar CF ≈ 10–12%
To meet 100–120 GW winter peak with 50% average CF:
→ 200–250 GW of nameplate generation capacity is required.
This is 120–160 GW more than the UK currently has.
Wind and solar cannot meet peak demand without storage they cannot supply.
Only:
- deep geothermal,
- new nuclear,
- tidal range, and
- long-duration storage
can stabilise a high-electricity system in winter.
- Conclusion: The Scale of Electrification Requires a Strategic State
The corrected demand model proves three core truths:
- Electrification is possible — but only with a new national energy architecture.
- “Net zero” as currently defined is mathematically impossible.
- The UK requires a strategic, engineering-driven rebuild of its energy system.
By 2050, the UK must:
- double annual electricity generation
- double or triple winter peak capacity
- build 60–80 GW of new firm generation.
- reinforce every distribution network.
- rebuild transmission north–south.
- deploy long-duration storage.
- electrify heat, transport, and industry.
- secure a stable baseload for digital infrastructure.
- produce hydrogen for heavy industry.
This is not optional.
It is the price of national stability.
PART IV — The BDA 25-Year Electrification Strategy (Rewritten & Corrected)
- Introduction: A Strategy Built on Physical Reality, Not Political Illusion
The United Kingdom has spent three decades pretending it could decarbonise through political declarations rather than engineering. Targets were announced without system models. Deadlines were published without feasibility studies. Policy was built on assumptions that are mathematically impossible: that wind alone could replace firm power; that batteries could replace seasonal storage; that heat pumps would magically fit into a grid never designed to carry winter heating loads; that interconnectors could replace domestic energy security; that data centres could expand indefinitely without baseload; that rail electrification could be achieved without reconfiguring substations; and that the private market would invest in infrastructure that regulators refused to approve.
The BDA rejects this fantasy.
Electrification is not a slogan. It is a national rebuild project, the largest civil engineering transformation since the Industrial Revolution. It requires a coherent architecture: firm power, long-duration storage, an upgraded transmission backbone, reinforced distribution networks, tidal predictability, mandatory rooftop solar, reformed planning law, a domestic manufacturing base for SMRs and geothermal equipment, and a national workforce capable of delivering it.
This strategy outlines how Britain actually becomes a fully electrified, energy-secure nation by 2050 — not through political hope, but through engineering.
- Strategic Principle One: Firm Power Is the Foundation of Electrification
Electrification cannot proceed without replacing gas-fired stability with new firm, dispatchable, zero-carbon generation. The corrected national model shows that Britain will require:
- 620–750 TWh of electricity per year,
- 100–120 GW of winter peak capacity,
- 200–250 GW of total nameplate generation,
- 60–80 GW of firm, round-the-clock baseload.
This requires building:
2.1 Deep Geothermal — The Immediate, Scalable, 24/7 Baseline
Deep geothermal is not speculative. It uses:
- millimetre-wave drilling,
- high temperature geopolymers,
- supercritical water extraction,
- closed loop systems,
- conventional steam turbines.
It can be built anywhere in the UK and provides 90–97% capacity factor, better than nuclear.
Geothermal provides:
- continuous generation
- domestic heat supply for industry and district heating
- no weather dependency
- no imports
- no fuel costs
- no geopolitical exposure
It is the single most neglected energy asset available to Britain, requires investment and government backing, has been proven by the Eden project to be a viable technology with their test drill. This has not been ignored by government, there is a report, Future of the subsurface: geothermal energy generation in the UK (annex), published 28 November 2024 on this very subject, but the government is not doing very much about it.
2.2 Modern Nuclear — Large Reactors + SMRs
Britain requires:
- 20–30 GW of new nuclear large-reactor capacity
- At least 10–15 GW of SMR capacity
- a domestic fuel-cycle capability
- regulatory overhaul
- modular manufacturing instead of bespoke construction
- a fleet approach, not one-off projects
Large reactors provide baseload for the national system; SMRs provide regional baseload for industrial clusters.
2.3 Tidal Range — Predictable, Stable, Underutilised
Tidal energy is perfectly predictable centuries in advance and is already proven.
The BDA strategy includes at least:
- one Severn tidal project
- one Mersey tidal project
- exploration of Solway, Wash and north-east coast sites
Together, tidal range can provide 2–4 GW of stable, dispatchable supply.
- Strategic Principle Two: Renewables Are Essential — But They Are Not the System
Wind and solar are crucial contributors, reducing gas consumption and lowering marginal electricity costs. But political fantasies about a “100% wind-and-battery grid” collapse on contact with the corrected demand model.
Wind and solar cannot:
- Replace firm baseload.
- Deliver winter peak stability.
- Provide seasonal energy.
- Stabilise the grid.
- Ensure system inertia.
- Power data centres.
- Support industrial heat.
- Deliver multi-day reliability.
But they can:
- Reduce fossil fuel usage.
- Support hydrogen production in surplus.
- Lower daytime marginal cost.
- Diversify the energy portfolio.
Thus, the BDA strategy positions renewables as supporting pillars, not the foundation.
3.1 Offshore Wind
Britain retains global leadership potential in offshore wind, but this requires:
- A meshed offshore HVDC grid.
- New coastal substations.
- Mandatory transmission corridors.
- Predictable Contracts for Difference.
- UK-based turbine and blade manufacturing.
- Replacement of foreign turbine dependency.
3.2 Onshore Wind
Abolition of arbitrary planning restrictions is essential. The BDA will.
- Reclassify onshore wind as “national strategic infrastructure”.
- Cap appeals at one tier.
- Mandate regional energy planning zones.
3.3 Solar Photovoltaics
Change to building Regulations to mandate.
- All new build houses have a south facing roof.
- Each south facing roof has a minimum of 5kW solar PV installed.
- 10kW of Standby Battery Installed in each domestic house.
- Blocks of apartments require a south facing roof with at least 4kW PV per apartment installed and 6kW battery per apartment. PV can be installed on the south facing wall.
- 10–30 kW for commercial.
- Planning Laws to be changed to allow large industrial sites and Data Centres to augment their energy requirements with wind turbines, subject to sound and safety constraints.
Solar is not a winter solution, but it supports summer load and reduces annual total demand on firm capacity.
- Strategic Principle Three: Grid Reinforcement is Non-Negotiable
Electrification lives and dies by grid capacity. The corrected model shows Britain cannot deliver electrification without the largest grid-upgrade programme in national history.
4.1 Transmission Reinforcement
The BDA strategy mandates:
- two north–south 6–8 GW HVDC spines
- an east-west HVDC spine
- a meshed offshore HVDC grid
- compulsory connection points for all offshore zones
- new inland 400 kV corridors to major cities
- integration of geothermal and nuclear hubs
Transmission is the backbone. Without it, all renewable potential collapses.
4.2 Distribution Reinforcement
The most underestimated element in UK electrification.
Heat pumps alone add ~33 GW peak load.
EVs add ~17.5 GW.
The BDA mandates:
- new distribution substations
- new neighbourhood transformers
- low-voltage feeder reinforcement
- phase balancing
- voltage-regulation upgrades
- smart-grid integration
We will impose binding reinforcement schedules on DNOs and tie them to their licence conditions.
4.3 System Stability Technologies
To replace gas-fired inertia, a stable system must deploy:
- synchronous condensers.
- grid-forming inverters.
- pumped-storage inertia.
- nuclear inertia.
- geothermal inertia.
- voltage-stability buffers.
This must be centrally planned, not left to market happenstance.
- Strategic Principle Four: Heating Reform Must Be Immediate and Mandatory
Heating electrification is not optional; it is the cornerstone of national demand reduction and energy independence.
5.1 Heat Pumps
BDA mandates:
- heat pumps in all new homes from 2026.
- accelerated training of 30,000 new heat pump engineers.
- subsidised ground-source adoption.
- installation requirements linked to insulation performance.
- phase-out of gas boilers by 2035 for new builds.
- full phase-out by 2040.
5.2 Insulation
The UK has the worst housing stock in Western Europe. Electrification collapses without insulation.
BDA mandates:
- EPC B minimum for all new homes
- funded retrofit for EPC D and below.
- national district-heating zoning.
- external wall and loft insulation standards.
- heat-loss standards for landlords.
Heating efficiency is not a climate measure; it is grid protection.
- Strategic Principle Five: Transport Electrification Must Be Structured, Not Chaotic
Electrification of transport requires coordinated infrastructure, not random decentralised adoption.
6.1 EV Charging
BDA mandates:
- kerbside charging in all dense residential zones.
- 150–350 kW rapid hubs every 20 miles on motorways.
- workplace charging requirements for all employers >10 staff.
- megawatt-charging corridors for HGVs.
- grid-synchronised “smart charging” technology.
- mandatory vehicle-to-grid (V2G) standards for new EVs.
6.2 Electrified Rail
- finish national rail electrification by 2040.
- shift freight from road to rail using electric sidings.
- electrify key ports and logistical hubs.
6.3 Ports and Airports
- shore-to-ship power in all major ports.
- electrification of ground operations at all airports.
- hydrogen-based fuels for medium/long-haul flights.
- Strategic Principle Six: Industrial Revival Depends on Cheap, Firm Power
Industry cannot be rebuilt on intermittent electricity. Manufacturers require:
- predictable pricing.
- firm capacity.
- baseload for heat and process energy.
The BDA mandates:
7.1 Industrial Power Zones
Regions anchored around:
- SMRs.
- geothermal clusters.
- hydrogen production.
These zones provide ultra-cheap, firm electricity to manufacturing.
7.2 Hydrogen for Industry
Hydrogen production becomes:
- local.
- grid-stabilising.
- integrated with SMRs and geothermal plants.
Hydrogen is not a domestic fuel. It is an industrial feedstock.
- Strategic Principle Seven: Storage Must Expand Beyond Batteries
Short-duration lithium batteries cannot stabilise a national system.
BDA mandates a diversified storage portfolio:
- pumped hydro (multiple Coire Glas–scale sites).
- liquid air storage.
- salt-cavern hydrogen storage.
- thermal storage.
- district heating buffers.
- industrial-scale battery hubs.
- Financing the Transition: A Realistic, Affordable 25-Year Programme
Electrification is expensive, but fossil dependence is ruinous.
The UK spent £117 billion importing energy in 2022 alone.
The full national electrification programme costs:
- £520–850 billion over 25 years, or
- £21–34 billion per year,
- less than half of the annual NHS budget
- a fraction of the cost of energy imports
- cheaper than the long-term cost of inaction
This programme will:
- reduce energy bills.
- stabilise inflation.
- re-industrialise the UK.
- eliminate energy-import dependency.
- create hundreds of thousands of skilled jobs.
Electrification is not a cost. It is an investment in national security and economic survival.
- Timeline: A Realistic, Engineering-Led 25-Year Path
2025–2035: Foundations
- Build first 5 GW geothermal.
- Build 10–12 GW nuclear.
- Begin tidal range.
- Expand offshore wind.
- Reinforce distribution grid.
- Begin transmission HVDC spine.
- Deploy 5 million heat pumps.
- Electrify 25% of freight.
- Mandatory solar rooftops.
- National insulation programme.
2035–2045: Expansion
- Geothermal → 15–20 GW.
- Nuclear → 20–25 GW.
- SMRs distributed regionally.
- Rail electrification complete.
- Manufacturing hubs activated.
- Pumped hydro added.
- Hydrogen industrial clusters operational.
2045–2050: Completion
- Geothermal → 30–40 GW.
- Nuclear → 30–40 GW.
- Tidal → 3–4 GW.
- Renewables → 120–150 GW.
- Storage → 20–40 GW.
- Hydrogen → fully integrated.
- UK grid stable at 100–120 GW peak.
- Annual generation 700 TWh stable.
The UK becomes a fully electrified, secure, sovereign energy state.
- Conclusion: A Nation Rebuilt Through Competence, Not Ideology
This strategy replaces the illusions of “net zero” with a plan built on physics, engineering, and strategic self-interest.
It delivers:
- Energy independence.
- Economic resilience.
- Industrial revival.
- National stability.
- Affordable power.
- A modernised grid.
- High-skilled jobs.
- A secure digital future.
- Britain can electrify.
- Britain can prosper.
- But Britain must choose competence over stagnation.
The BDA offers that path.
PART V — Implementation, Governance, and the Rebuilding of Britain’s Energy State
- Introduction: Strategy Without Execution Is Just Ambition
Parts I–IV establish the physical necessity of electrifying the United Kingdom, the structural inadequacy of the current system, and the engineering blueprint for a stable, sovereign energy future. But strategy without delivery is meaningless. The UK’s greatest institutional failure in the last three decades has not been the lack of ambition; it has been the lack of capacity, discipline, and governance to execute even its most basic infrastructure programmes.
Electrification cannot be left in the hands of fragmented regulators, disjointed agencies, slow planning authorities, privately-owned grid companies with minimal incentives to invest, or government departments buffeted by political winds. It requires a new operational architecture — one designed not around political cycles, but around the physical realities of the energy system and the long-term interests of the nation.
Part V sets out the governance reforms required to deliver the BDA strategy.
- The UK’s Current Institutional Landscape: A System Designed to Fail
No nation can deliver a 25-year electrification programme through a regulatory structure as fractured as the UK’s. Energy policy is currently split across:
- DESNZ (policy, often rewritten annually)
- Ofgem (economic regulation, disincentivising investment)
- National Grid ESO (operability and balancing)
- National Grid Transmission (physical backbone ownership)
- Six privately-owned Distribution Network Operators
- Local planning authorities (slow, inconsistent, and obstructionist)
- Environmental agencies
- Multiple devolved governments
- Private developers
- Competing lobby groups
- Treasury (the most anti-infrastructure finance department in the Western world)
This fragmentation guarantees paralysis. No single entity is responsible for:
- strategic grid design
- long-term energy security
- baseload capacity planning
- distribution reinforcement
- storage procurement
- industrial energy zoning
- coordinated heating strategy
- national workforce development
- SMR manufacturing
- geothermal development
- tidal project delivery
This is why British energy infrastructure takes decades to build, why nuclear collapsed, why geothermal never started, why pumped hydro stalled, why rail electrification costs triple their European equivalents, and why planning approvals take longer than construction.
- The BDA Solution: A New National Energy and Infrastructure Authority (NEIA)
To deliver the 25-year programme, the BDA proposes the establishment of the National Energy and Infrastructure Authority (NEIA) — a permanent, statutory, technocratic institution with clear legal powers and a singular mandate: build, integrate, and secure the UK’s national energy future.
3.1 NEIA Powers
NEIA will possess:
- Statutory override powers over local planning authorities
- Authority to commission and approve all major energy infrastructure
- Mandatory grid sequencing powers (transmission + distribution)
- The ability to direct National Grid and DNO investment schedules
- Direct control over SMR and geothermal deployment zones
- Authority to approve and mandate tidal range construction
- Power to set national insulation and heating standards
- Legislative power to enforce completion deadlines
- National procurement authority for grid components, cables, substations, reactors, drilling rigs and offshore platforms
- Transparent public accountability through parliamentary oversight
This ends the decades of drift, duplication, and denial.
3.2 NEIA Governance Structure
To prevent political distortion, NEIA will be:
- Technocratic, not political
- Mandated for 25-year strategic horizons
- Shielded from party-political interference
- Required to publish quarterly progress reports
- Subject to an independent engineering review board
- Supervised by a mixed parliamentary committee with no power to override technical decisions
Energy systems cannot obey political cycles; they obey physics. NEIA is designed accordingly.
- Financing the 25-Year Programme: Discipline, Not Debt
Electrification is affordable — if managed correctly. As established in Part IV, the total cost is:
- £520–850 billion over 25 years,
- or £21–34 billion per year.
For context:
- UK energy imports in 2022: £117 billion
- Covid spending (2 years): £410 billion
- Annual welfare inefficiencies: £30–40 billion
- HS2 sunk costs: £35+ billion
The issue is not affordability — it is governance.
4.1 Funding Model
The BDA proposes:
- Long-term sovereign infrastructure bonds
- Windfall and excess-profit regulatory restructuring
- Power Purchase Guarantees (PPGs) for firm generation
- Accelerated depreciation allowances for industrial electrification
- Co-investment frameworks for geothermal and SMRs
- UK Infrastructure Bank mandate expansion
- Ring-fenced energy security budget
- Planning process penalties for delays
This is financial discipline, not ideological austerity.
4.2 What We Will Not Do
The BDA rejects:
- stealth levies
- consumer surcharges
- “green taxes” on households
- regressive carbon pricing
- reliance on foreign investment
- public-private schemes with no public control
- speculative subsidy giveaways
Britain will build its own energy future.
- Planning Reform: Ending the 30-Year Culture of Obstruction
No infrastructure plan survives the British planning system. The current regime makes building anything — pylons, substations, wind farms, housing, SMRs, or geothermal wells — an exercise in political masochism.
The BDA will implement:
5.1 Strategic National Infrastructure Zones (S-NIZ)
All energy infrastructure above a defined threshold becomes:
- nationally strategic
- exempt from local obstruction
- subject to single-timeline approval
- managed under NEIA control
5.2 Time-Limited Approvals
- Planning authorities given six months to respond
- Automatic approval if deadlines are missed
- Environmental assessments capped at 12 months
- Appeals limited to one tier with fixed timelines
5.3 Land Acquisition Reform
NEIA may:
- acquire land with fair compensation
- standardise compulsory purchase valuations
- ensure zoning consistency
The planning system will no longer be a national suicide pact.
- Building the Workforce: The United Kingdom Energy Corps (UKEC)
Britain cannot electrify without people.
The 25-year programme requires:
- tens of thousands of grid engineers
- nuclear specialists
- geothermal drilling technicians
- turbine technicians
- SMR assembly teams
- high-voltage electricians
- civil engineers
- planners
- welders
- offshore workers
- insulation teams
- heat pump installers
- battery engineers
- hydrogen plant operators
To deliver this, the BDA establishes the UK Energy Corps (UKEC) — a national training and deployment body with:
- 2-year apprenticeships
- technical officer pathways
- cross-skilling programmes
- SMR & turbine manufacturing academies
- strategic partnerships with FE colleges and universities
- veteran retraining programmes
- international recruitment frameworks for skill-gaps
Electrification becomes a national employment engine, not a burden.
- Industrial Capacity: Rebuilding Britain’s Energy Manufacturing Base
Britain cannot depend on imported technology. To ensure sovereignty, the BDA mandates the development of:
7.1 SMR Manufacturing Hubs
Two nationwide production facilities to fabricate:
- reactor vessels
- heat exchangers
- control systems
- steam turbines
- modular assembly units
7.2 Geothermal Drilling Industry
A domestic industry capable of:
- 10–20 km deep drilling
- supercritical loop installation
- well maintenance
- geothermal pump assembly
- grid integration
7.3 Turbine & Power Electronics Manufacturing
A return to:
- British casting
- blade fabrication
- inverter manufacturing
- transformer assembly
- HVDC cable production
7.4 Hydrogen & Electrolyser Supply Chain
The UK will establish domestic capacity for:
- alkaline and PEM electrolysers
- hydrogen compressors
- storage cylinders
- pipeline conversion equipment
The BDA strategy ensures energy sovereignty from source to substation.
- Consumer Protection: Ensuring That Electrification Lowers Bills
Electrification must reduce living costs — not raise them.
BDA measures include:
- cap on standing charges
- regulated grid-connection fees
- volatility control via firm generation
- mandatory supplier transparency
- dynamic time-of-use pricing with strict protections
- rooftop solar and storage incentives for low-income households
- heat pump installation grants targeted at coldest homes
- tax exemption for home-generated electricity
- automatic bill reduction from local surplus generation
Electrification is only politically viable if households directly feel its benefits.
- Digital Infrastructure Integration: Energy for a Data-Driven Nation
The BDA embeds digital energy planning into national energy planning:
- mandatory baseload provision for new data centres
- requirement for on-site generation of at least 20–30%
- geothermal district heating for large compute clusters
- UKEC training for data-centre energy managers
- integration with national AI systems for real-time grid optimisation
The UK cannot protect its digital sovereignty on an unstable grid.
- Public Accountability: Transparent Progress and Independent Scrutiny
The BDA mandates quarterly publication of:
- grid-reinforcement progress
- geothermal drilling milestones
- SMR construction status
- tidal project development
- infrastructure delays and causes
- consumer bill impacts
- domestic heating conversion numbers
- industrial clustering progress
NEIA will operate with complete public transparency.
- Conclusion: Competence Replaces Chaos
Part V confirms a simple truth:
Britain doesn’t need new slogans, it needs a functioning state.
Electrification is not an environmental vanity project.
It is a national survival project.
With a unified authority, disciplined financing, reformed planning, a trained workforce, domestic manufacturing, firm power at scale, and a grid built to support national electrification, the UK will become:
- energy sovereign
- economically resilient
- globally competitive
- digitally secure
- industrially rebuilt
- environmentally responsible
This is not a dream.
This is engineering.
And this is how the BDA restores national competence and public confidence.
PART VI — Energy Sovereignty, National Resilience, and the Transformation of the United Kingdom
- Introduction: The Energy Question as the Defining Strategic Issue of the Century
Energy is the master resource. It underpins national security, economic strength, industrial capacity, technological progress, social stability, and environmental stewardship. The nations that control energy control their future. The nations that fail to secure energy become weak, dependent, unstable, and vulnerable.
For decades, Britain has drifted into the second category.
The UK has allowed itself to become dependent on foreign gas, foreign turbines, foreign reactors, foreign manufacturing, foreign battery supply chains, foreign compute centres, and foreign capital. It has allowed planning systems to stall infrastructure, regulators to block investment, and political parties to chase headlines instead of strategy.
The BDA’s electrification plan is not just an energy policy.
It is a national reconstruction strategy.
Part VI explains the deeper significance of this transformation, and why the UK’s rebirth depends on taking control of its own energy destiny.
- Energy Sovereignty: The Foundation of National Security
Energy sovereignty means simple things:
- We produce our own energy.
- We control our own infrastructure.
- We no longer rely on other nations for essential supply.
- We cannot be held hostage by foreign interests.
- We insulate ourselves from global commodity shocks.
The corrected electrification model shows that the UK will require:
- 620–750 TWh per year
- 100–120 GW winter peak
- 200–250 GW nameplate generation
- massive transmission and distribution upgrades
- firm baseload for stability
If Britain does not secure this capacity domestically, it will be forced to rely on:
- imported LNG
- imported electricity
- foreign-owned nuclear technology
- foreign solar supply chains
- imported hydrogen
- unreliable global markets
- adversarial geopolitical actors
The energy crisis of 2021–2023 proved this beyond doubt.
The UK cannot afford to repeat that experience.
- Energy and Economic Resilience: Ending the Decline
Energy prices drive inflation, productivity, investment, manufacturing costs, food costs, logistics, rail fares, digital expansion, and household stability. The UK economy is structurally weakened because its energy system is fragile.
Electrification under the BDA blueprint delivers:
3.1 Lower, Stable Long-Term Energy Prices
Firm domestic energy — geothermal, nuclear, tidal — eliminates exposure to volatile global markets.
3.2 Reindustrialisation
Cheap, reliable electricity enables:
- steelmaking
- chemical production
- advanced materials
- data centres
- fabrication
- hydrogen-based manufacturing
3.3 Reduced Inflation
Cheap, stable energy holds down food, logistics, and industrial costs.
3.4 Higher Productivity
Businesses operate without fear of spikes or shortages.
3.5 Investment Confidence
Investors trust a system built on physics, not political promises.
Electrification is not a “green project”.
It is a national economic recovery strategy.
- Energy and Social Stability: A Civilised Society Needs Reliable Power
A modern society collapses quickly without reliable energy.
Heating, lighting, hospitals, communications, rail, water pumping, emergency services — all depend on uninterrupted electricity.
Unstable energy systems produce:
- higher household costs
- fuel poverty
- civil resentment
- distrust in institutions
- economic contraction
- failing public services
- declining life expectancy
A nation cannot be civil, prosperous, or stable if its energy system is weak.
The BDA plan ensures:
- firm winter power
- secure baseload
- stable pricing
- reliable grid operation
- sufficient capacity for public services
This is the difference between a functioning society and one in decline.
- Environmental Stewardship: A Realistic, Scientific Approach
The modern environmental movement has fractured into two camps:
- Those who understand physics and engineering
- Those who believe slogans substitute for reality
The BDA belongs unequivocally to the first group.
5.1 Real environmentalism is engineering
True environmental protection means:
- stable, low-carbon baseload
- deep geothermal heat
- nuclear with modern waste handling
- tidal predictability
- pumped hydro
- rooftop solar
- efficient heating systems
- high-quality standards for buildings
It does not mean:
- relying on intermittent generation without storage
- pretending batteries can replace gas or nuclear
- outsourcing emissions overseas
- ignoring peak load behaviour
- pretending Britain has Iceland’s geothermal geology
- banning technologies without replacements
- hoping the grid survives cold stills
5.2 The BDA plan cuts emissions through engineering, not ideology
Electrification under this framework:
- eliminates most fossil fuels
- delivers near-zero-carbon baseload
- stabilises the grid
- protects ecosystems
- reduces land use
- optimises renewable placement
5.3 Environmental realism protects public support
Ordinary people will support decarbonisation only if:
- it lowers bills
- it works in winter
- it does not collapse the grid
- it does not require self-sacrifice
- it does not insult their intelligence
The BDA strategy aligns public support with engineering integrity.
- Geopolitical Independence: A Nation That Cannot Be Manipulated
Energy dependency has shaped UK foreign policy for decades.
A Britain reliant on imported fuels is a Britain with:
- reduced diplomatic leverage
- compromised decision-making
- vulnerability to supply shocks
- susceptibility to foreign pressure
- weaker negotiating positions
- impaired military readiness
The BDA plan reverses this.
A UK with:
- domestic geothermal drilling,
- SMRs built in Britain,
- tidal range plants in its estuaries,
- pumped storage in its mountains,
- firm baseload capacity,
- hydrogen hubs,
- reinforced grid infrastructure,
- energy independence,
is a nation that cannot be coerced.
Energy sovereignty is national sovereignty.
- Digital Security: Powering a 21st-Century Information State
The digital sector now consumes more energy globally than aviation.
Britain’s 513 data centres rely on uninterrupted power.
A single hour of outage:
- causes millions in financial damage
- disrupts emergency services
- cripples logistics
- halts hospital systems
- breaks national cybersecurity processes
Data centres require always-on baseload, not hopeful renewables.
The BDA plan provides:
- geothermal baseload for compute clusters
- SMR-fed industrial parks
- mandatory on-site generation
- hydrogen backup systems
- grid-forming inverters for stability
- intelligent load balancing
- NEIA oversight of digital-energy integration
No advanced nation can function digitally without stable energy.
- National Morale and Legitimacy: A State That Works
Infrastructure is legitimacy.
When:
- trains run on time
- energy bills remain stable
- homes are warm
- the grid is reliable
- industry is productive
- public services function
- the country builds things again
…the public trusts the state.
When infrastructure collapses:
- politics polarises
- institutions weaken
- extremism rises
- social trust evaporates
Energy is the backbone of national legitimacy.
The BDA plan provides a functional, rational, competent state — something Britain has lacked for decades.
- A Nation Reborn Through Competence
Electrification is the mechanism through which Britain rebuilds:
- its economy
- its infrastructure
- its engineering base
- its manufacturing capability
- its institutions
- its confidence
- its global relevance
- its social stability
The UK must choose:
- Decline, dependency, insecurity, instability, and permanent vulnerability
or - Sovereignty, resilience, competence, prosperity, and a functioning modern state
The BDA chooses competence.
The BDA chooses sovereignty.
The BDA chooses electrification done properly.
The BDA chooses the future.
PART VIII — The Rebirth of the British State: Energy as the Engine of National Renewal
- Introduction: The Moment of Decision
Electrification is not solely an engineering challenge.
It is the pivot upon which the United Kingdom’s future turns.
Throughout this white paper, we have revealed a simple truth:
A nation that cannot control its own energy cannot control its destiny.
Britain today is trapped between diminishing infrastructure, incoherent policy, decaying institutions, and an outdated national identity rooted in past achievements. The BDA strategy is not merely a replacement of energy systems — it is the first step in reconstructing the modern British state.
Part VIII defines what this transformation achieves and why it matters beyond kilowatts, transmission lines, and technology. This is about identity, resilience, prosperity, and national rebirth.
- The Failure of the Neoliberal State
For 40 years, the UK has embraced an economic and political philosophy built around:
- outsourcing
- deregulation
- privatisation
- offshoring
- minimal state investment
- short-termism
- dependency on foreign supply chains
- institutional fragmentation
- an allergy to strategic planning
This model functioned only while the world was stable, global trade was cheap, fossil fuels were abundant, and Britain still had residual industrial strength.
Those conditions no longer exist.
The neoliberal model has collapsed.
Its symptoms are everywhere:
- infrastructure paralysis
- energy insecurity
- rising living costs
- declining public services
- institutional incompetence
- political fragmentation
- industrial decay
- stagnant wages
- collapsing productivity
- widespread public mistrust
- the slow erosion of national confidence
The BDA energy plan is the first major blueprint in decades to confront this systemic failure head-on.
- The New Model: Strategic National Competence
The BDA proposes a new operating model for the British state:
3.1 Long-term strategy over political short-termism
Energy policy must operate on 25–50 year timelines, not 2–5 year election cycles.
3.2 State-coordinated planning, privately delivered excellence
The private sector excels at innovation and execution.
The state must excel at direction, sequencing, and accountability.
3.3 Infrastructure built for the people, not for headlines
No more announcements without engineering.
3.4 Energy as a national security mission
Stable power is as vital as military strength.
3.5 Technology-neutral, physics-led policy
Ideology cannot dictate engineering.
3.6 Domestic production replaces fragile imports
SMRs, turbines, transformers, drilling equipment, and storage systems must be built in Britain.
3.7 A functional, meritocratic state replaces institutional drift
Competence becomes the rule, not the exception.
This is not a theoretical model — it is the backbone of the entire 25-year electrification programme.
- National Confidence and Social Renewal: What a Functional Energy System Achieves
A stable, affordable, sovereign energy system restores something Britain has lost: confidence.
Not the chest-beating nationalism of decline.
But the quiet confidence of a country that works.
A Britain where:
- infrastructure is reliable
- engineers are respected
- industry thrives
- innovation flourishes
- the grid is stable
- public services function
- energy bills remain affordable
- wages rise with productivity
- life is predictable, stable, and secure
…is a Britain that no longer feels anxious, declining, or directionless.
Energy stability reduces social stress.
Stable prices reduce household anxiety.
Reliable infrastructure reduces political polarisation.
Functional systems reduce national cynicism.
Economic revival rebuilds civic pride.
When the state works, society stabilises.
- Britain’s Place in the World: From Dependency to Leadership
If implemented, the BDA strategy positions the UK as:
5.1 A global leader in geothermal drilling
Britain can become the European hub for deep geothermal innovation and export expertise.
5.2 A manufacturing centre for SMRs and HVDC infrastructure
Rebuilding domestic engineering capability elevates the UK from importer to exporter.
5.3 A pioneer of tidal range engineering
Few nations have Britain’s geography; none have fully exploited it.
5.4 A stable, reliable energy partner
The UK becomes a backbone of European energy stability, not a dependent.
5.5 A secure digital nation
A grid capable of supporting AI and data-centre expansion positions Britain at the forefront of digital sovereignty.
5.6 A national model for competent transition
The UK becomes proof that a mature democracy can modernise without collapse, coercion, or social fracturing.
Electrification done properly is a geopolitical asset.
- Rebuilding Britain’s Industrial and Scientific Base
Energy and industry are inseparable.
You cannot rebuild one without the other.
The BDA strategy enables:
- advanced materials manufacturing
- low-carbon steel
- chemical and pharmaceutical expansion
- aerospace and advanced composites
- hydrogen-based production
- large-scale battery assembly
- robotics and automation clusters
- semiconductor facilities
- AI compute centres
- shipbuilding with firm power hubs
- electric heavy-transport corridors
- localised energy microgrids supporting innovation hubs
This is not nostalgia for lost industries — it is the foundation of new ones.
- The Moral Dimension: A Civilization That Endures
Energy is not merely economic. It is moral.
A nation that cannot heat its homes is not civilised.
A nation that cannot power its hospitals has failed its people.
A nation whose grid is unstable cannot call itself advanced.
A nation dependent on others for energy cannot call itself sovereign.
A nation that ignores physics cannot call itself rational.
A nation that abandons engineering abandons civilisation.
The BDA strategy asserts a moral obligation:
A state must provide reliable, affordable, stable energy to its people.
Without this, nothing else works.
Electrification is not about carbon targets.
It is about protecting the dignity of the citizen.
- The National Philosophy Behind the BDA Energy Strategy
This plan is guided by six philosophical principles:
8.1 Reality over ideology
Physics is not optional.
8.2 Competence over chaos
Systems must work before they inspire.
8.3 Sovereignty over dependency
A nation must stand on its own feet.
8.4 Engineering over fantasy
A stable grid is not built through slogans.
8.5 Long-term thinking over short-term politics
Infrastructure requires generational planning.
8.6 The citizen above the state
Energy policy must serve the public, not burden them.
These principles define the BDA difference.
- Conclusion: A Blueprint for Britain’s Future
The BDA energy strategy is not simply a policy proposal.
It is a national renaissance plan.
It transforms Britain from:
- importer to producer
- dependent to sovereign
- fragile to resilient
- declining to revitalised
- fragmented to unified
- reactive to strategic
- short-termist to long-term focused
- ideologically confused to scientifically grounded
It rebuilds infrastructure, renews industry, strengthens society, restores competence, protects the environment, revitalises democracy, and asserts national sovereignty.
Energy is the root of civilisation.
A nation that masters its energy masters its future.
This is how Britain rises again — not through nostalgia, not through slogans, but through competence.
Through engineering.
Through sovereignty.
Through national purpose.
Through the British Democratic Alliance.
Reference List
BEIS (Department for Business, Energy & Industrial Strategy) (2021) Energy Consumption in the UK (ECUK) 2021: Domestic energy consumption tables. London: UK Government.
BEIS (2022) Digest of UK Energy Statistics (DUKES) 2022. London: UK Government.
BEIS (2022) Future Energy Scenarios: Detailed Demand Pathways. London: UK Government.
BloombergNEF (2023) UK Electricity Market Outlook 2023. London: Bloomberg L.P.
Carbon Trust (2020) Heat Pump Field Trial Report: Energy Performance and Seasonal Efficiency. London: Carbon Trust.
CCC (Climate Change Committee) (2020) Sixth Carbon Budget: Electricity Sector Analysis. London: CCC.
CCC (2021) The Role of Hydrogen in a Net Zero Economy. London: CCC.
CIBSE (2021) Guide A: Environmental Design – Heating and Cooling Load Guidance. Chartered Institution of Building Services Engineers.
Cornell, J. & Sims, R. (2021) ‘Industrial electrification pathways for developed nations’, Energy Policy, 149, pp. 1–15.
Data Centre Council (UK) (2023) State of the UK Data Centre Industry. London: Data Centre Alliance.
Delta-EE (2021) Heat Pump Market Report 2021. Edinburgh: Delta Energy & Environment.
Department for Transport (2022) National Travel Survey: Vehicle mileage and fuel consumption. London: DfT.
Eaton Corporation (2020) Grid Modernisation for High-Electrification Scenarios: HVDC, Inverters and Storage. Dublin: Eaton.
Electric Power Research Institute (EPRI) (2019) Grid Stability Under High Renewable Penetration. Palo Alto: EPRI.
Energy Systems Catapult (2020) Innovating to Net Zero: Heat, Power and Infrastructure. Birmingham: ESC.
Ferns, A. (2022) ‘The UK’s Distribution Grid Constraints under Electrification’, Journal of Power Engineering, 54(3), pp. 112–130.
Froggatt, A. & Schneider, M. (2022) The World Nuclear Status Report 2022. Paris: Mycle Schneider Consulting.
IEA (International Energy Agency) (2021) United Kingdom 2021 – Energy Policy Review. Paris: IEA.
IEA (2022) Global Hydrogen Review 2022. Paris: IEA.
IEA (2023) Renewables 2023: Market Outlook for Solar and Wind. Paris: IEA.
IPCC (Intergovernmental Panel on Climate Change) (2021) AR6 Working Group I: Physical Science Basis. Geneva: IPCC.
KPMG (2021) Future of EV Infrastructure: Costs, Grid Impact and Deployment Strategy. London: KPMG UK.
National Grid ESO (2020) Electricity Ten Year Statement (ETYS) 2020. Warwick: National Grid ESO.
National Grid ESO (2022) Future Energy Scenarios 2022. Warwick: National Grid ESO.
National Grid ESO (2023) Winter Outlook Report 2023/24. Warwick: National Grid ESO.
National Infrastructure Commission (2021) Second National Infrastructure Assessment: Electricity Networks and Demand. London: NIC.
National Renewable Energy Laboratory (NREL) (2019) Long-Duration Energy Storage for Grid Stability. Colorado: US DOE.
Ofgem (2022) Electricity Distribution Annual Report 2022. London: Ofgem.
ONS (Office for National Statistics) (2023) UK Trade in Goods: Fuel Imports and Exports. London: ONS.
Ramboll (2020) Geothermal Energy in Northern Europe: Resource and Technology Assessment. Copenhagen: Ramboll.
REEA & Durham University Energy Institute (2021) Deep Geothermal Potential in the UK: Updated Assessment. Durham: DEI Press.
Royal Academy of Engineering (2019) Generation Technologies and Grid Stability: Engineering Review. London: RAE.
Scottish Renewables & SSE (2021) Offshore Wind and Transmission Constraints: The Curtailment Crisis. Glasgow: Scottish Renewables.
Siemens Energy (2022) HVDC Transmission Systems: Deployment, Economics and Grid Integration. Berlin: Siemens AG.
Stone, A. & Jenkins, N. (2020) ‘Distribution Network Challenges During Electrification of Heat and Transport’, Applied Energy, 276, pp. 115–123.
UKERC (UK Energy Research Centre) (2020) Heat Decarbonisation Research Landscape. London: UKERC.
Worley Group (2022) Industrial Electrification & Hydrogen Integration: A Practical Framework for Developed Economies. Melbourne: Worley.
WSP Global (2021) UK Tidal Range Feasibility Review. Montreal: WSP.
TECHNICAL ANNEX — Corrected Load Modelling, Peak Analysis, Capacity Requirements, and System Architecture
(All figures and tables are BDA-verified and built on corrected ESO-style modelling, incorporating diversity factors, COP behaviour, seasonal curves, and realistic load factors.)
- NATIONAL ELECTRIFICATION DEMAND MODEL (Corrected)
Table A1 — Annual Electricity Demand by Sector (2050)
| Sector | Annual Demand (TWh) | Notes |
| Domestic – non-heating | 115 | Includes digital appliances, cooling, lighting, baseload use |
| Domestic – heating (HP) | 100 | COP 2.5–3, winter season only, full electrification |
| EV Transport | 45 | Based on 1,700–2,000 kWh/vehicle/yr, 22–25M BEVs |
| Small commercial | 5 | Electrified ASHP + lighting + equipment |
| Rail (passenger + freight) | 30 | Full rail electrification + increased frequency |
| Data centres & digital | 20 | Continuous baseload requirement |
| Industry (direct electricity) | 140 | Electrified furnaces, motors, process heat |
| Hydrogen (industrial feedstock) | 100 | 80–120 TWh range |
| Services / Public sector | 115 | Hospitals, schools, retail, logistics |
| TOTAL | 670–750 TWh | Final corrected range |
- PEAK LOAD MODEL (Corrected)
Table B1 — Peak Electricity Demand Contributions
| Component | Added Peak (GW) | Notes |
| Domestic heat pumps | 33 | Winter high-pressure scenario |
| EV charging | 17.5 | 10% charging simultaneously at 7 kW |
| Data centres | 3 | Continuous, unshiftable |
| Rail | 5 | Winter commuter/evening peak |
| Industrial load | 10 | Electrified industrial clusters |
| Base system load (today) | 45–48 | Current peak |
| TOTAL PEAK (corrected) | 100–120 GW | Planning band |
- NAMEPLATE GENERATION REQUIREMENTS
Table C1 — Required Installed Capacity for 100–120 GW Peak
| Technology | Typical Capacity Factor | Required GW for 2050 System |
| Nuclear (large reactors) | 80–90% | 20–30 GW |
| SMRs | 85–90% | 10–15 GW |
| Deep geothermal | 90–97% | 30–40 GW |
| Tidal range | 25–35% (dispatchable) | 2–4 GW |
| Offshore wind | 40–45% | 80–100 GW |
| Onshore wind | 25–33% | 20–30 GW |
| Solar PV | 10–12% | 40–60 GW |
| Long-duration storage | n/a | 20–40 GWh/day output |
| Total Nameplate Required | — | 200–250 GW |
- STORAGE REQUIREMENTS
Table E1 — National Storage Portfolio (2050 Requirement)
| Storage Type | Required Scale | Role |
| Pumped Hydro | 20–30 GWh/day | Multi-day firming, inertia |
| Liquid Air / Cryogenic | 5–10 GWh/day | Medium-duration balance |
| Hydrogen Storage | TWh-scale | Industrial & seasonal |
| Grid Batteries | 10–20 GWh | Seconds–hours response |
| Thermal Storage | Heat banks, industrial buffers | Local load shifting |
- HEATING TRANSITION REQUIREMENTS
Table F1 — National Heating Conversion (Milestones)
| Year | Heat Pump Install Target | Notes |
| 2035 | 600,000 | Current trajectory |
| 2035 | 5 million | Workforce expansion required |
| 2040 | 12–15 million | Majority of suitable homes converted |
| 2045 | 23–26 million | Full phase-out of gas boilers |
| 2060 | ~100% | Electrified heating baseline |
- TRANSPORT ELECTRIFICATION
Table G1 — EV Impact on Grid
| Variable | Value |
| Vehicle fleet (2050) | 22–25 million BEVs |
| Avg. annual consumption | 1.7–2 MWh per vehicle |
| Annual demand | ~40–50 TWh |
| Peak contribution | ~17.5 GW |
| Main stress | Local LV feeders |
- INDUSTRIAL ELECTRIFICATION & HYDROGEN
Table H1 — Industrial Electricity Demand
| Industrial Sector | Direct Electricity (TWh) | Hydrogen Use (TWh) |
| Steel | 25–30 | 15–20 |
| Chemicals | 15–25 | 20–30 |
| Manufacturing | 20–30 | 10–15 |
| Food & pharma | 10–15 | 5–10 |
| Materials & textiles | 10–12 | — |
| TOTAL | 120–150 | 80–120 |
- BDA BASELOAD REQUIREMENT DIAGRAM (Engineering Version)
2060 Firm Power Target: ~75 GW
Sources:
35 GW Geothermal (Closed-loop, supercritical)
25 GW Nuclear LR + SMR fleet
3 GW Tidal range
10 GW Pumped storage discharge.
2 GW Hydrogen CHP (industrial backup only)
TOTAL FIRM: 75 GW (meets winter minima)
- NATIONAL ELECTRIFICATION ROADMAP TABLE
Table J1 — BDA 25-Year Buildout (Summary)
| Period | Key Deliverables |
| 2035–2045 | 5 GW geothermal; 12 GW nuclear; HVDC spine start; insulation programme; 5M heat pumps |
| 2045–2050 | 20 GW geothermal; 25 GW nuclear; rail electrification; hydrogen hubs; SMRs; pumped hydro |
| 2050–2060 | 40 GW geothermal; 40 GW nuclear; 150 GW renewables; 20–40 GWh storage; completed grid |
© British Democratic Alliance 2025